A crane is about to lift a bundle of steel. The trained signaller has been called away, and a labourer who hasn't been trained offers to give the crane driver signals.

What should happen?

Choose one answer.

  1. A. Let the labourer do it, as long as they use hand signals
  2. B. Let the crane driver lift without any signals
  3. C. Let the labourer do it while the driver uses the horn to warn people
  4. D. Wait for a trained, competent signaller
Show the answer and explanation

Answer: D

  • A. Wrong: Wrong. The labourer may not know the standard signals or the dangers of the lift. Only trained people should direct a crane.
  • B. Wrong: Wrong. If the lift was planned with a signaller, it must not go ahead without one.
  • C. Wrong: Wrong. A horn is no substitute for trained signalling. The lift should wait.
  • D. Right: Right. People who sling loads and direct lifts must be trained and competent, and use agreed standard signals.

Explanation

Lifting operations must be planned, and only trained, competent people should sling loads or signal to crane drivers.