HS&E Operatives practice question: Demolition and dismantling (2 of 7)
D. High risk activities A free question from our original HS&E Operatives practice exam. Try it, then open the answer to see why each option is right or wrong.
What must the client give the demolition contractor about asbestos before the work starts?
Choose one answer.
AA. A refurbishment and demolition asbestos survey
BB. Nothing, as asbestos is dealt with after demolition
CC. A list of the factory's former workers
DD. A photo of the building from the outside
Show the answer and explanation
Answer: A
A. Right: Right. HSE says the client must give the contractor a refurbishment or demolition survey, so any asbestos can be found and dealt with before demolition.
B. Wrong: Wrong. Demolishing a building with asbestos in it would release fibres. It must be found and removed first.
C. Wrong: Wrong. That doesn't tell the contractor where asbestos is.
D. Wrong: Wrong. Asbestos is often hidden inside a building. A proper survey is needed.
Explanation
Before demolition, the client must provide a refurbishment and demolition survey, plus information such as live services. Asbestos must be dealt with before the building comes down.