You are replacing old heating pipes in a 1970s school. The pipes have old lagging on them.

What should you do?

Choose one answer.

  1. A. Strip it off quickly and bag it
  2. B. Wet it down and carry on cutting it out carefully
  3. C. Carry on, as lagging is never asbestos
  4. D. Stop, as the lagging may contain asbestos
Show the answer and explanation

Answer: D

  • A. Wrong: Wrong. Disturbing asbestos releases fibres.
  • B. Wrong: Wrong. Stop and find out what it is first.
  • C. Wrong: Wrong. Pipe lagging is a common place for asbestos.
  • D. Right: Right. HSE lists lagging on plant and pipework as a place asbestos may be found. If you think a material may contain asbestos, stop work.

Explanation

Old pipe lagging may contain asbestos. Stop and check before disturbing it.