A short hand-dug tunnel is planned under a road to carry a new pipe.
When should you decide what temporary support it needs?
Choose one answer.
A A. After the first metre has been dug outB B. Before any digging startsC C. Once the face has been opened up and checkedD D. Only if the ground looks loose on the dayShow the answer and explanation Answer: B
A. Wrong: Wrong. Support must be planned before any digging.B. Right: Right. HSE says before digging any trench, pit, tunnel or other excavation, decide what temporary support will be needed.C. Wrong: Wrong. Plan the support before you start.D. Wrong: Wrong. Ground that looks firm can still collapse.Explanation Plan the temporary support for a tunnel or excavation before any digging starts.