A wall is to be removed to make an opening in an existing building.
Who should decide the method and design of temporary supports?
Choose one answer.
A A. A competent person, after a surveyB B. The newest labourer on siteC C. Whoever has the biggest hammerD D. Nobody, as the wall can just be knocked outShow the answer and explanation Answer: A
A. Right: Right. HSE says a competent person should survey and assess the structure and decide the method and the design of temporary supports.B. Wrong: Wrong. This needs a competent person.C. Wrong: Wrong. This needs planning and design.D. Wrong: Wrong. That could cause a collapse.Explanation Alterations need a structural survey and a competent person to plan the method and temporary supports.