A scaffold has been put up around a building being demolished.
Can the exclusion zone be made smaller because of the scaffold?
Choose one answer.
A A. Yes, by about half, as the scaffold will catch most debrisB B. Yes, the zone can be removed altogetherC C. Only at weekendsD D. NoShow the answer and explanation Answer: D
A. Wrong: Wrong. The scaffold doesn't reduce the zone.B. Wrong: Wrong. The zone is still needed.C. Wrong: Wrong. The zone is needed whenever there is a risk.D. Right: Right. HSE says a scaffold does not allow the exclusion zone to be reduced.Explanation Exclusion zones depend on the demolition method. A scaffold doesn't justify making them smaller.