Two demolition jobs on the same street use different methods: one by hand and one with a high-reach machine.
What decides the size of each exclusion zone?
Choose one answer.
A A. It is always exactly 10 metresB B. How many workers are on siteC C. Whether there is a scaffold around the buildingD D. The demolition method being usedShow the answer and explanation Answer: D
A. Wrong: Wrong. There is no fixed size. It depends on the method.B. Wrong: Wrong. The zone depends on how far debris could travel, which depends on the method.C. Wrong: Wrong. HSE says a scaffold does not allow the exclusion zone to be made smaller.D. Right: Right. HSE says the size of exclusion and debris zones depends on the demolition technique being used.Explanation Exclusion zones are sized for the demolition method, so debris from a planned or accidental collapse stays inside them.