Exams / HS&E RAAC / Electrical isolation / Question 5
HS&E RAAC practice question: Electrical isolation (5 of 5) E. Specialist: HVACR – refrigeration and air conditioning A free question from our original HS&E RAAC practice exam. Try it, then open the answer to see why each option is right or wrong.
Last verified October 2026 against HSE guidance and the law ·How we write our questions
Other trades will be drilling and cutting near the existing electrics during an air conditioning refit.
What does HSE say?
Choose one answer.
A A. Tell the other trades to be careful, and nothing moreB B. Switch off the whole streetC C. Isolate the relevant partsD D. Leave it live, so the lights stay onShow the answer and explanation Answer: C
A. Wrong: Wrong. Isolate the relevant parts.B. Wrong: Wrong. Isolate the relevant parts.C. Right: Right. HSE says where other trades' work could disturb or damage the existing system, isolate the relevant parts.D. Wrong: Wrong. Isolate the relevant parts.Explanation Isolate parts of the electrical system that other trades' work could damage.
Study Keep practicing Answer questions with a score at the end, or practice just this topic with the explanation after each one. No sign-up needed.