You are about to replace a compressor contactor on an air conditioning unit.
What must be done first?
Choose one answer.
A A. Work on it live, carefullyB B. Check it with your fingerC C. Make it dead and prove it deadD D. Switch off at the unit and hope for the bestShow the answer and explanation Answer: C
A. Wrong: Wrong. Don't work live if it can be avoided.B. Wrong: Wrong. That could kill.C. Right: Right. HSE says electricity supplies should be made dead and proved to be dead before work starts.D. Wrong: Wrong. It must be proved dead.Explanation Make the supply dead, prove it dead, and stop it being switched back on.
Study A client asks you to fault-find on a live control panel because it is quicker.
What does HSE say?
Choose one answer.
A A. Live work is fine if you are quickB B. Live work is fine on small unitsC C. Live work is fine with rubber bootsD D. Avoid working liveShow the answer and explanation Answer: D
A. Wrong: Wrong. Avoid live work.B. Wrong: Wrong. Avoid live work.C. Wrong: Wrong. Avoid live work.D. Right: Right. HSE says electrical contractors should not work live if it can be avoided.Explanation Avoid live working. Make equipment dead before working on it.
Study You have isolated an air conditioning unit to work on it.
What should the method of isolation do?
Choose one answer.
A A. Stop it being switched back onB B. Allow anyone to turn it onC C. Leave the fuse in a drawer nearbyD D. Turn off only the display screenShow the answer and explanation Answer: A
A. Right: Right. HSE says the method of isolation should prevent inadvertent or deliberate re-energisation.B. Wrong: Wrong. It should prevent re-energising.C. Wrong: Wrong. It should prevent re-energising.D. Wrong: Wrong. Isolate the supply.Explanation Isolation must stop anyone switching the supply back on, by accident or on purpose.
Study An apprentice asks if they can wire up a new condensing unit on their own.
What does HSE say?
Choose one answer.
A A. Anyone, if the client agreesB B. Only trained, competent peopleC C. Anyone, if they follow the wiring diagram on the lidD D. Anyone over 18 can do itShow the answer and explanation Answer: B
A. Wrong: Wrong. Electrical work needs training and competence.B. Right: Right. HSE says electrical work should only be done by those who are trained and competent to do it.C. Wrong: Wrong. Electrical work needs training and competence.D. Wrong: Wrong. Age is not competence.Explanation Electrical work must only be done by trained, competent people.
Study Other trades will be drilling and cutting near the existing electrics during an air conditioning refit.
What does HSE say?
Choose one answer.
A A. Tell the other trades to be careful, and nothing moreB B. Switch off the whole streetC C. Isolate the relevant partsD D. Leave it live, so the lights stay onShow the answer and explanation Answer: C
A. Wrong: Wrong. Isolate the relevant parts.B. Wrong: Wrong. Isolate the relevant parts.C. Right: Right. HSE says where other trades' work could disturb or damage the existing system, isolate the relevant parts.D. Wrong: Wrong. Isolate the relevant parts.Explanation Isolate parts of the electrical system that other trades' work could damage.
Study Study Electrical isolation More E. Specialist: HVACR – refrigeration and air conditioning topics