Course menuHS&E MAP

Exams / HS&E MAP / Demolition and structural stability / Question 2

HS&E MAP practice question: Demolition and structural stability (2 of 4)

D. High risk activities A free question from our original HS&E MAP practice exam. Try it, then open the answer to see why each option is right or wrong.

Last verified against HSE guidance and the law ·How we write our questions

A building due for demolition is next to a busy road.

What should the demolition plan include?

Choose one answer.

  1. A. Exclusion zones sized for the method
  2. B. Only a sign saying "demolition in progress"
  3. C. A plan to work only at night to avoid traffic
  4. D. Nothing about the road, as it is outside the site
Show the answer and explanation

Answer: A

  • A. Right: Right. HSE says exclusion zones and debris zones depend on the demolition method, and must protect people.
  • B. Wrong: Wrong. A sign doesn't keep people away from falling debris.
  • C. Wrong: Wrong. Timing may help, but exclusion zones are still needed.
  • D. Wrong: Wrong. People outside the site must be protected too.

Explanation

Plan exclusion zones for the demolition method, so debris can't reach people, including the public.

Study

Keep practicing

Answer questions with a score at the end, or practice just this topic with the explanation after each one. No sign-up needed.