A building due for demolition is next to a busy road.
What should the demolition plan include?
Choose one answer.
A A. Exclusion zones sized for the methodB B. Only a sign saying "demolition in progress"C C. A plan to work only at night to avoid trafficD D. Nothing about the road, as it is outside the siteShow the answer and explanation Answer: A
A. Right: Right. HSE says exclusion zones and debris zones depend on the demolition method, and must protect people.B. Wrong: Wrong. A sign doesn't keep people away from falling debris.C. Wrong: Wrong. Timing may help, but exclusion zones are still needed.D. Wrong: Wrong. People outside the site must be protected too.Explanation Plan exclusion zones for the demolition method, so debris can't reach people, including the public.