Exams / HS&E HIW / Finding buried services
Finding buried services questions for the Highway works (HIW) specialist test 6 free questions on Finding buried services, from section E. Specialist: Highway works. Every question is original and explains why each option is right or wrong.
Last verified October 2026 against HSE guidance and the law ·How we write our questions
You are about to break out a footway to dig a trench.
What should you get before digging?
Choose one answer.
A A. Nothing, as you will see cables as you digB B. A list from passers-by of what is thereC C. Only the weather forecast for the weekD D. Plans of the buried services in the areaShow the answer and explanation Answer: D
A. Wrong: Wrong. Cables are often hard to see until it is too late.B. Wrong: Wrong. Get proper plans from the service owners.C. Wrong: Wrong. You need plans of the buried services.D. Right: Right. HSE says obtain plans or other suitable information about all buried services before excavating.Explanation Before digging, get plans of buried services, then use a locator and dig carefully.
Study You have utility plans for a street you are about to dig up.
How far can you rely on them?
Choose one answer.
A A. They are only a guideB B. They are exact to the centimetreC C. They always show every cableD D. They mean no locator is neededShow the answer and explanation Answer: A
A. Right: Right. HSE says plans give only an indication of the location, configuration and number of services.B. Wrong: Wrong. Plans are only an indication.C. Wrong: Wrong. Some services may be missing or wrongly shown.D. Wrong: Wrong. Use plans together with a locator.Explanation Plans only show roughly where services are. Use a locator as well, and dig trial holes.
Study Your gang has a cable locator for a day's trench digging.
When should it be used?
Choose one answer.
A A. Never, if you have plansB B. Often, all through the workC C. Once, at the start of the dayD D. Only if the plans are missingShow the answer and explanation Answer: B
A. Wrong: Wrong. Plans are only a guide.B. Right: Right. HSE says locators should be used frequently and repeatedly during the work.C. Wrong: Wrong. Use it again and again as the dig goes on.D. Wrong: Wrong. Use it with the plans, not instead of them.Explanation Use a cable locator frequently and repeatedly as the dig goes on.
Study The locator shows a cable running across your trench line. You are hand digging to expose it.
How should you dig?
Choose one answer.
A A. With a pick, to break through quicklyB B. By probing the ground with a long metal barC C. Alongside the cable, not on top of itD D. Straight down onto it to find it fastShow the answer and explanation Answer: C
A. Wrong: Wrong. A pick can pierce a cable.B. Wrong: Wrong. A metal bar could pierce a live cable.C. Right: Right. HSE says excavate alongside the service rather than directly above it, using insulated tools near electric cables.D. Wrong: Wrong. You could strike the cable.Explanation When exposing a cable, dig alongside it, not directly above, and use insulated tools.
Study You have plans and have used a locator, but you need the exact position of a service before digging near it.
What does HSE say to do?
Choose one answer.
A A. Guess from the plans and digB B. Use the machine to find itC C. Ask the driver where it isD D. Dig trial holes to find itShow the answer and explanation Answer: D
A. Wrong: Wrong. Plans are only a guide.B. Wrong: Wrong. A machine bucket can strike the service.C. Wrong: Wrong. Confirm the position with trial holes.D. Right: Right. HSE says trial holes should be dug to identify the exact positions of services.Explanation Use plans and a locator, then dig trial holes to find the exact position of each service.
Study You can't get any information about buried services for a small dig in an old street.
How should you go ahead?
Choose one answer.
A A. As though there are services thereB B. As though there are no servicesC C. With a bigger machine to dig fasterD D. Only after dark when it is quieterShow the answer and explanation Answer: A
A. Right: Right. HSE says if information can't be obtained, carry out the work as though there are buried services in the area.B. Wrong: Wrong. Assume services are there.C. Wrong: Wrong. Speed raises the risk of striking a service.D. Wrong: Wrong. The time of day doesn't change the risk.Explanation With no information on services, work as though buried services are there.
Study Study Finding buried services More E. Specialist: Highway works topics